Work
Case studies
What I built, the hard part, and how it turned out. Clients under NDA are shown by sector, not by name.
More topics (76)
Cybernetics Energy Meter: a prepaid smart meter developed in Bangladesh
Cybernetics Hi-Tech Solutions (Pvt) Ltd
A single-phase prepaid smart meter, re-engineered and developed in Bangladesh by the team I lead at Cybernetics, with our own DLMS/COSEM and STS firmware. It is heading into IEC type testing.
Smart Meter Firmware — DLMS/COSEM
Utility sector · client under NDA
Standards-compliant metrology and multi-channel communication firmware for utility-grade smart electricity meters, built on the Hitrend HT5023 metrology MCU.
Advanced Metering Infrastructure (AMI) Platform
Utility sector · client under NDA
System architecture for HES, MDM, STS-based prepayment, and multi-vendor meter interoperability — connecting utility-scale smart meters to billing and business systems.
Next step
Tell me what you are building.
Fixed-price projects and hourly work, for clients anywhere. Send the scope and I will reply by email.